Free written quote, fully insured, MCS-certified installation across CV37 and the surrounding villages.

If your solar panels are generating more than you use during the day, that surplus is going back to the grid for very little return. A battery storage system changes that. We install Tesla Powerwall 3, GivEnergy, Fox ESS, and EcoFlow units across Stratford-upon-Avon and the surrounding villages, storing the energy your panels produce so you can use it in the evening, overnight, or whenever the panels are not generating. We also configure systems to charge from the grid on cheap off-peak tariffs, so you are drawing on low-cost electricity even on cloudy days or in winter.
We are MCS-certified and NAPIT-registered, which means your installation meets the standards required for Smart Export Guarantee payments and any relevant warranty claims. We do not subcontract. The engineers who survey your property are the same people who install the kit, and we carry full public-liability and employer's liability insurance before we step through your door.
What's included
A pre-installation survey of your existing solar array, consumer unit, and available wall space, so we can specify the right battery chemistry and capacity for your actual usage pattern rather than guessing.
Supply and installation of your chosen battery system, whether that is a Tesla Powerwall 3, GivEnergy AIO, Fox ESS, or EcoFlow unit, fitted to manufacturer specification and current wiring regulations.
Full integration with your existing solar inverter and consumer unit, including any required upgrades to isolators, cabling, or metering to bring the installation up to current standards.
Configuration of your preferred charge schedule, including off-peak tariff charging windows (Octopus Agile, Economy 7, or similar), so the battery fills automatically at the cheapest rate.
An IWA insurance-backed guarantee on the installation work itself, giving you long-term protection that sits alongside the manufacturer's product warranty.
A completion handover: we walk you through the monitoring app, explain what the charge and discharge readings mean, and leave you with a written record of the installation for your insurer and any future property sale.
Local knowledge
Stratford-upon-Avon sits in south Warwickshire, roughly 30 minutes south-east of Redditch via the A435 through Alcester. The town centre and much of the historic core fall within a designated conservation area, which shapes what is and is not straightforward when it comes to solar and battery installations. Battery storage, however, is almost always installed internally, typically in a garage, utility room, or on an internal wall, so the conservation area designation that can complicate visible rooftop panels rarely creates obstacles for battery work. Homeowners in streets close to the Shakespeare properties, along the Waterside, or in the older terraces running off Arden Street can generally add a battery system without any planning conversation at all.
The outer residential areas tell a different story in terms of property type. Bishopton, Shottery, and Tiddington contain a good mix of detached and semi-detached homes from the post-war period and later, many of which already have or are planning solar arrays. These are the properties where battery storage makes the most immediate financial sense: south or south-west facing roofs with unshaded panels generating a genuine daily surplus. Newer estates on the edges of the town often have modern consumer units and adequate garage space, making installation straightforward. Older properties closer to the town centre may have smaller consumer units or older wiring that needs assessment before a battery can be added safely, which is exactly why we survey before we quote.
The Warwickshire climate is broadly similar to the wider West Midlands: useful solar generation from March through to October, with shorter days and lower irradiance through winter. A correctly sized battery extends the value of summer generation into the evening and can make a real difference to how much grid electricity a household draws on. Pairing battery storage with an off-peak tariff means the system continues to earn its place even in the darker months, filling overnight at a low rate and discharging during the morning and evening peaks. We specify systems with this in mind, and we will always tell you honestly if the numbers on a given property do not stack up.
Why Stratford-upon-Avon
Stratford-upon-Avon customers choose us because we hold the right accreditations, do not subcontract, and give a written quote before any work is agreed.
MCS-certified installation on every battery job, which is the standard required to access Smart Export Guarantee payments and to validate most manufacturer warranties. Without MCS, you may find those benefits are unavailable to you.
NAPIT-registered electricians carry out all wiring work. Battery storage is a notifiable electrical installation; a NAPIT-registered contractor can self-certify to Building Regulations, so you are not left chasing paperwork after the job is done.
IWA insurance-backed guarantee on the installation, sitting alongside the manufacturer's product warranty. If anything goes wrong with the workmanship, the guarantee is protected independently of us as a business.
Free, written, itemised quote after a physical survey, with no hidden costs. We will not quote over the phone without seeing the property, and we will not add line items on the day that were not in the original document.
We cover Stratford-upon-Avon from our base in Redditch, roughly 30 minutes away. That means we can return quickly for any follow-up visit and we are familiar with the property types, DNO arrangements, and grid infrastructure across Warwickshire.
How it works
Enter your CV37 postcode on our website or call 01527 337155. We confirm we cover your area, which for Stratford-upon-Avon and its surrounding villages we do, and we arrange a convenient survey time. No commitment required at this stage.
One of our engineers visits the property, checks your existing solar array and inverter, inspects the consumer unit and available installation space, and discusses your usage pattern and tariff. This is the point where we identify any compatibility issues or additional electrical work that may be needed.
We send a fully itemised written quote within a short time of the survey. Every cost is listed separately. There are no call-out fees, no provisional sums, and no items added on the day. You can take as long as you need to review it.
Once you accept the quote, we agree an installation date that suits you. We confirm the equipment lead time at this stage so you know exactly when to expect us. We do not ask you to wait in all day for a broad window.
Our engineers complete the installation, carry out all required electrical checks, configure your charge schedule, and walk you through the monitoring app. We take before-and-after photos of the installation for your records, and we send you the MCS certificate and NAPIT completion certificate by email.
Our work
A selection of our recent solar battery storage work across the Midlands.




Often booked together
Many Stratford customers book battery storage at the same time as a new solar array. Installing both together saves a second visit, allows the system to be sized and specified as a single unit, and reduces the total amount of remedial wiring work.
An EV charger paired with a battery lets you charge your car from stored solar rather than the grid. We can configure the charger to draw from the battery during off-peak windows, making the combination genuinely cost-effective for Stratford households with a driveway and solar panels.
Older Stratford properties sometimes need consumer unit upgrades or additional circuit capacity before a battery can be safely installed. Combining both jobs in one visit avoids repeat call-outs and means the electrical work is certified under a single NAPIT notification.
Worth knowing
Conservation area properties in central Stratford-upon-Avon: battery storage is installed internally, so planning permission is rarely required. However, if any external cable runs or meter modifications are needed, it is worth confirming with Stratford-on-Avon District Council before work begins, particularly on Grade II listed buildings.
Existing solar inverter compatibility: not every older inverter communicates cleanly with every battery system. Before committing to a particular brand, our survey checks your current inverter model and confirms whether a gateway device, inverter replacement, or AC-coupled solution is the most practical route.
Consumer unit capacity and cable sizing: homes in Stratford with older fuse boards or narrow meter tails may need an upgrade before a battery can be added safely. We flag this at survey stage so there are no surprises on installation day, and any additional work is quoted separately and in writing.
FAQs
In most cases, no. Battery storage systems are installed internally, so they do not alter the external appearance of a property and do not typically require planning permission, even within the Stratford-upon-Avon conservation area. The exception might be if external cable runs or ventilation penetrations are visible on a listed building. We check this at survey stage and will tell you clearly if any notification or consent is needed before we book an installation date. Contact Stratford-on-Avon District Council's planning department if you have a specific concern about a listed property.
We install Tesla Powerwall 3, GivEnergy AIO, Fox ESS, and EcoFlow systems. Each has different characteristics in terms of capacity, continuous output, and compatibility with existing inverters. The right choice depends on your solar array size, your household's peak demand, whether you want whole-home backup capability, and which inverter you already have. We do not push one brand over another for commercial reasons. After the survey, we will recommend the system that genuinely fits your property and usage pattern, and we will explain the reasoning in plain terms so you can make an informed decision.
Yes, in most cases. The key variable is your existing inverter. A hybrid inverter can connect directly to a DC-coupled battery. A standard string inverter requires an AC-coupled solution or, in some cases, a replacement inverter. Some older inverters also lack the communication protocols needed to optimise a battery's charge and discharge schedule. Our survey checks compatibility before we quote, so you know exactly what is involved. If an inverter upgrade is needed, we include it as a separately itemised line in the quote so there are no surprises.
Tariffs like Octopus Agile or Economy 7 offer cheaper electricity during overnight or off-peak windows, typically in the early hours of the morning. A battery storage system can be programmed to charge from the grid during those windows, so the stored energy is available during the morning and evening demand peaks when grid electricity is more expensive. We configure this schedule during installation and show you how to adjust it if your tariff changes. Combined with daytime solar generation, the battery can significantly reduce how much peak-rate grid electricity a Stratford household draws. Every setup is different, which is why we survey first and quote after.
It depends on the system. Not all battery installations include automatic backup functionality. Tesla Powerwall 3 and some GivEnergy configurations can provide whole-home or partial backup during a power cut, isolating your property from the grid and keeping essential circuits running. This capability needs to be specified at the design stage, as it affects how the system is wired and which gateway or gateway-less configuration is used. If backup power is important to you, tell us at the survey and we will specify accordingly. Properties in the outer villages around Stratford, where grid supply can occasionally be disrupted, sometimes prioritise this feature.
Yes. All our installation work is covered by an IWA insurance-backed guarantee, which protects the workmanship independently of us as a business. This sits alongside the manufacturer's product warranty on the battery unit itself, which varies by brand and model. Because we are MCS-certified, your installation also meets the standard required for Smart Export Guarantee registration and most manufacturer warranty claims. We provide you with the MCS certificate, NAPIT completion certificate, and a written record of the installation on the day the job is finished. These documents are important for your insurer and for any future property sale.
Our commitment
We take on a limited number of battery storage installations each week. That is deliberate. It means every survey is thorough, every installation is done by the same engineers who specified the system, and every customer gets a proper handover rather than a rushed finish. We would rather turn down work than cut corners on an installation that will be sitting in your property for the next decade.
Who we are
We are Djuka Electrics, based in Beoley, Redditch, Worcestershire. We cover Stratford-upon-Avon and the wider Warwickshire area as part of our 50-mile service radius. Our MCS certification covers solar and battery storage; our NAPIT registration covers all electrical installation work. Real photos and genuine customer reviews are available on our website and Google profile.
Nearby
More in Stratford-upon-Avon
Send your postcode and a few details. Within 24 hours you’ll have an honest, written quote from a qualified Midlands electrician, no pushy sales calls, no hidden charges.