Free, no-obligation survey and written quote for Birmingham homeowners and businesses considering a solar battery installation.

Birmingham's housing stock is as varied as any city in the UK, and so are its energy needs. Whether you have an existing solar array on a 1930s semi in Kings Heath, a new-build in Edgbaston, or a Victorian terrace in Moseley, adding battery storage lets you use the electricity you generate rather than feeding it back to the grid at a low export rate. We install Tesla Powerwall 3, GivEnergy, Fox ESS, and EcoFlow systems across all B-postcodes and the wider Birmingham area.
We are MCS-certified installers and NAPIT-registered electricians. That means the installation meets the standards your network operator and insurer require, and you can access any relevant grid export schemes. We carry out a proper survey before quoting, size the battery to your actual consumption, and do not leave until the system is commissioned, tested, and working as it should. No subcontracting, no cutting corners.
What's included
A pre-installation survey of your consumer unit, existing solar array (if fitted), meter setup, and available wall or floor space, so we size the battery correctly before ordering anything.
Supply and installation of your chosen battery system, whether Tesla Powerwall 3, GivEnergy, Fox ESS, or EcoFlow, including all mounting hardware, DC and AC cabling, and protection devices to current wiring regulations.
Full configuration of the battery management system, including setting charge windows to align with any off-peak tariff you are on, such as Octopus Go or Intelligent Octopus, to maximise overnight cheap-rate charging.
Grid connection notification submitted on your behalf to your Distribution Network Operator, so the installation is correctly registered and does not affect your export payments or future metering arrangements.
Whole-system test and commissioning in your presence, covering charge cycles, backup behaviour (where the unit supports whole-home backup), and app setup so you can monitor generation, storage, and consumption in real time.
All MCS documentation, NAPIT electrical certification, and an IWA insurance-backed guarantee issued on completion, giving you a fully compliant paper trail for your insurer, mortgage lender, or future property sale.
Local knowledge
Birmingham is the most varied catchment we serve. The city spans dozens of distinct neighbourhoods, each with its own dominant property era and construction type. Edgbaston and Harborne lean toward large Edwardian and inter-war semis with generous south-facing roof pitches, which are often already solar-ready or already solar-equipped. Selly Oak, Stirchley, and Kings Heath are packed with 1930s bay-fronted semis where loft conversions and rear extensions have sometimes complicated the roof geometry, requiring a careful survey before battery placement is confirmed. In the north of the city, areas like Erdington and Sutton Coldfield fringe contain a mix of post-war council stock and 1960s to 1980s private builds, many of which have had solar retrofitted in the past decade and are now prime candidates for storage.
The central B-postcodes present a different challenge. Flats, maisonettes, and converted Victorian terraces dominate inner Birmingham, and battery storage here requires careful thought about consumer unit location, metering arrangements, and whether the supply capacity is adequate. Where a property has a smart meter and a compatible export arrangement, a battery installation can work well even in a flat, but it needs a thorough electrical survey first. We see strong demand for combined battery and EV charger installations across Birmingham, particularly in the south-west of the city where higher car ownership and longer commutes make overnight charging economics compelling.
Birmingham's grid infrastructure is well-developed but busy. Connections to the Western Power Distribution (now National Grid Electricity Distribution) network require a G98 or G99 notification depending on the total export capacity of your combined solar and storage system. We handle that paperwork as a matter of course. Conservation areas exist in parts of the city, including the Jewellery Quarter and some suburban conservation zones, but battery storage is typically an internal or rear-mounted installation and rarely triggers planning requirements. If you are in a listed building or a designated conservation area, we will flag any constraints during the survey.
Why Birmingham
Birmingham homeowners choose us because we survey properly, specify honestly, and install to a standard that holds up under scrutiny from network operators and insurers alike.
MCS certification covers both solar and battery storage, which means your installation qualifies for grid export schemes, meets DNO requirements, and satisfies any mortgage or insurance condition that requires accredited installation.
NAPIT registration means every electrical element of the installation is certified to current wiring regulations. You receive a full Electrical Installation Certificate on completion, not just a battery commissioning sheet.
We cover all Birmingham B-postcodes and are typically on site within two weeks of survey. We do not use subcontractors, so the engineer who surveys your property is the one who carries out the work.
Every quote is free, written, and itemised after a physical survey. We do not quote blind over the phone. If extra electrical work is needed, it appears in the quote before you commit, not as an add-on on installation day.
IWA insurance-backed guarantees are issued on all qualifying installations, giving you protection that goes beyond our own business continuity and satisfies most mortgage lender requirements for renewable energy additions.
How it works
Enter your Birmingham postcode on the website or call us on 01527 337155. We confirm coverage immediately. All B-postcodes and the wider Birmingham area fall within our 50-mile radius of our Redditch base, so coverage is rarely an issue.
An engineer visits your property to assess your consumer unit, roof and solar setup (if existing), available installation space, metering arrangement, and supply capacity. This is the step where we determine which battery model suits your property and usage, and whether any preliminary electrical work is needed.
We send a fully itemised written quote within 48 hours of the survey. It covers the battery system, all electrical work, DNO notification, certification, and the IWA insurance-backed guarantee. No hidden costs. You can ask questions before committing to anything.
Once you accept the quote, we agree an installation date that suits you. We aim to schedule within two weeks of acceptance for most Birmingham postcodes. You will receive a confirmation with the engineer's name and an arrival window.
Installation is completed in a single visit in the vast majority of cases. We commission and test the system with you, walk you through the app, and confirm the DNO notification has been submitted. Before and after photos are sent to you the same day along with all certification documents.
Our work
A selection of our recent solar battery storage work across the Midlands.




Often booked together
Most Birmingham homeowners adding battery storage either already have solar or are fitting both together. Installing panels and a battery in a single visit reduces labour time, limits disruption, and allows the system to be optimised as one unit from the start.
Battery storage and an EV charger make a compelling combination in Birmingham, where commuting distances justify overnight cheap-rate charging. A single survey can cover both installs, and we can programme the battery and charger to share an off-peak window without overloading the supply.
Older consumer units are common across Birmingham's pre-1980s housing stock. If your fuse board needs upgrading to accommodate the battery, we carry out that work at the same time, avoiding a return visit and ensuring the full installation is certified under one job.
Worth knowing
Battery storage systems add load to your existing consumer unit. Older fuse boards common in pre-1980s Birmingham homes may need upgrading to accommodate the additional protection devices required by current wiring regulations. We will identify this during the survey and include any remedial electrical work in the written quote so there are no surprises on the day.
If you are on a time-of-use tariff such as Octopus Go, the battery must be correctly programmed to charge during the cheap overnight window and discharge during peak hours. The savings depend entirely on your consumption pattern and tariff structure. We configure this during commissioning but recommend you review your tariff before booking so we can optimise the settings from day one.
Whole-home backup, sometimes called off-grid or blackout protection, requires the battery to incorporate an automatic transfer switch and the installation to isolate your property from the grid during an outage. Not all battery models offer this as standard, and it requires additional electrical work. If backup power is important to you, confirm this requirement when you request your survey so we specify the correct product.
FAQs
Most residential battery installations take between four and eight hours, depending on the complexity of your consumer unit, the location of the battery relative to your solar inverter, and whether any additional electrical work is needed. We carry out the survey in advance specifically to identify anything that might extend the installation time, so we can plan the day properly. We aim to complete in a single visit and do not leave the property until the system is fully commissioned and tested.
No. A battery can charge from the grid alone, which is useful if you are on a time-of-use tariff such as Octopus Go. You charge overnight at a lower rate and discharge during peak hours. That said, the economics improve significantly when the battery is paired with solar, because you capture generation that would otherwise be exported at a low rate. If you are considering both, it is worth getting a combined quote. We install solar and battery together across all Birmingham postcodes.
Yes, in many cases. The key constraints are consumer unit capacity, available space for the battery unit, and the metering arrangement. Some flats have supply limitations that need checking before a battery can be added. Converted Victorian terraces across Moseley, Balsall Heath, and similar areas often have older wiring that may need partial upgrading alongside the battery installation. We assess all of this during the free survey and include any required electrical work in the written quote, so you have a complete picture before you commit.
Adding a battery does not automatically affect your Smart Export Guarantee payments, but it can change the pattern of when you export. The DNO notification we submit on your behalf keeps your installation within the correct regulatory framework. If you are already on an SEG tariff, we recommend checking with your energy supplier after installation to ensure your export meter readings continue correctly. We handle the technical side of the notification; the tariff relationship remains between you and your supplier.
We install Tesla Powerwall 3, GivEnergy, Fox ESS, and EcoFlow systems. Each has different characteristics in terms of capacity, backup capability, inverter integration, and app functionality. During the survey we will discuss which suits your property, your existing inverter brand if you have solar, and your priorities around backup power versus everyday cycling. We do not push one brand over another; we recommend what is appropriate for your specific setup. All brands we install are covered by the MCS certification and IWA insurance-backed guarantee.
Every installation is different, which is why we do not quote figures before a survey. The cost depends on the battery model and capacity, any electrical upgrade work required at your consumer unit, the complexity of the installation route, and whether you are combining it with a new solar array or an EV charger. What we can say is that every quote is free, written, and fully itemised after the survey, with no hidden costs. You will see every element broken down before you decide. Call us on 01527 337155 or request a survey online to get started.
Our commitment
We limit the number of installations we take on each week so that every job gets a full-length survey and a properly planned installation day. Birmingham has a large pool of battery installers competing on price. We compete on doing it right: correct sizing, clean cabling, full documentation, and a system that performs as specified from day one. If that means we are not the cheapest quote you receive, we are comfortable with that.
Who we are
Djuka Electrics is based in Beoley, Redditch, and covers Birmingham and the wider West Midlands as a core part of our work area. We are MCS-certified for solar and battery storage and NAPIT-registered for all electrical work. Every installation is carried out by our own engineers. Our reviews and installation photos reflect real jobs on real properties across the region, and we are happy to share them before you commit.
Nearby
More in Birmingham
Send your postcode and a few details. Within 24 hours you’ll have an honest, written quote from a qualified Midlands electrician, no pushy sales calls, no hidden charges.