Free, written quote from MCS-certified engineers covering Banbury and the surrounding OX16 and OX17 areas.

Banbury homeowners are generating more solar energy than ever, but without storage, a large chunk of that generation disappears into the grid for a fraction of what it cost to produce. A solar battery captures that surplus during the day and makes it available after dark, during peak-rate hours, or whenever the sun is not shining. We install Tesla Powerwall 3, GivEnergy, Fox ESS, and EcoFlow systems, matched to your actual usage profile rather than a one-size-fits-all package.
We are MCS-certified and NAPIT-registered, which means your installation meets the standards required for grid connection, DNO notification, and any relevant export-tariff schemes. Every job comes with a free survey, a written itemised quote, and a clean installation with full commissioning. We cover Banbury from our Redditch base in around 50 minutes via the M40 and A422, with no call-out surcharge for the distance.
What's included
A full home energy assessment before we quote, reviewing your existing solar array or planned panel installation, your overnight consumption, your grid tariff, and any EV charger load, so the battery size recommendation is based on your actual numbers.
Supply and installation of your chosen battery system, whether that is a Tesla Powerwall 3, a GivEnergy unit, a Fox ESS stack, or an EcoFlow solution, fitted to manufacturer specification and our own internal quality standard.
Safe, tidy DC and AC cabling routed from your inverter or consumer unit to the battery enclosure, with cable management that keeps the installation looking clean inside your garage, utility room, or outbuilding.
Full DNO notification handled on your behalf, so your network operator is correctly informed of the new storage asset on your supply, meeting the requirements that protect your export tariff eligibility.
Complete system commissioning, including app setup, monitoring configuration, and a walkthrough with you so you understand how to read your battery state, set charge schedules, and switch to backup mode if needed.
Before-and-after photos of the installation sent to you on the day, plus a signed completion certificate and all warranty documentation for the battery and any associated inverter or gateway hardware.
Local knowledge
Banbury sits in north Oxfordshire at the edge of the Cotswolds, and the town's housing stock reflects that geography clearly. The conservation centre around the Market Place and Horse Fair contains stone-built Georgian and Victorian properties where roof access is sometimes restricted and consumer units are often in older configurations. These properties can still accommodate a battery system, but the survey matters: we need to assess the available space, the condition of the existing board, and whether a three-phase or single-phase connection is involved before we can specify the right unit.
Beyond the historic core, Banbury has grown significantly on its eastern and northern edges. Estates such as Hardwick and Hanwell Fields are largely made up of 2000s and 2010s new-builds with modern consumer units, garages or utility rooms suitable for wall-mounted battery enclosures, and roof orientations that tend to perform well for solar. Many of these households already have solar panels installed and are looking to add storage to stop exporting cheap generation and start using it at peak times instead. The combination of a GivEnergy or Fox ESS battery with an octopus-style agile tariff is particularly popular in this part of Oxfordshire, where grid electricity costs are a constant concern.
Banbury is also notably EV-friendly for a market town, given its position just off the M40. A significant number of residents commute by car and charge at home overnight. This matters for battery sizing: if you are charging an EV from your battery rather than drawing from the grid at peak rate, the demand profile changes substantially. We factor EV charger load into every storage quote we issue in Banbury, so you are not left with an undersized system six months after we finish.
Why Banbury
Banbury customers book us because we carry the right accreditations, do not cut corners on the survey, and handle every stage of the paperwork ourselves.
MCS certification covers our solar and storage installations end to end. That certification is a condition of most export tariff schemes and is required for compliant grid-connected storage in the UK, so it is not optional and not something we treat lightly.
NAPIT registration means our electrical work is inspected and certified to BS 7671. Every battery installation involves work on or near your consumer unit; having a registered electrician carry that out protects your home insurance and your building's compliance record.
We handle DNO notification as a standard part of every job. Most homeowners do not know this is required; we submit the correct G98 or G99 application on your behalf, so your network operator is informed and your export tariff is not at risk.
We offer IWA insurance-backed guarantees on qualifying installations, which means your workmanship warranty is protected even if circumstances change. That is a material difference from a guarantee backed only by a small installer's continued trading.
Every quote is free, written, and itemised with no hidden costs. We do not issue ballpark figures over the phone; we come to you, measure the job, and give you a document you can compare line by line against any other quote you receive.
How it works
Enter your OX16 or OX17 postcode when you call or enquire online. We confirm coverage immediately. Banbury falls well within our 50-mile radius from Redditch, and there is no travel surcharge applied to your quote.
We arrange a convenient time to visit your property. We assess your existing solar array or planned installation, your consumer unit, available battery locations, your current tariff, and your EV charger load if relevant. This takes around 45 to 60 minutes and costs nothing.
We send you a written, itemised quote typically within 24 hours of the survey. It breaks down equipment, labour, DNO notification, and commissioning separately, so you can see exactly what you are paying for and compare it against any other quote you hold.
Once you accept the quote, we agree an installation date that suits you. We give you a confirmed start time rather than a vague morning or afternoon window, so you are not waiting around. Most Banbury installations are scheduled within a few weeks of acceptance.
We carry out the full installation, commission the system, walk you through the app and charge schedules, and photograph the completed work. Before-and-after photos plus your completion certificate and all warranty documents are sent to you on the same day we finish.
Our work
A selection of our recent solar battery storage work across the Midlands.




Often booked together
Most Banbury battery enquiries come from homeowners who either already have panels or are planning to install them. Booking both together means a single survey, a single installation visit, and a system that is sized and configured to work as one unit from day one.
With so many Banbury residents commuting via the M40, home EV charging is common. Adding a battery alongside an EV charger means you can charge your car from stored solar rather than peak-rate grid electricity, which changes the economics of both installations.
Older Banbury properties sometimes need consumer unit work before a battery can be safely connected. Combining the electrical upgrade and the battery installation into one job with one engineer avoids two separate visits and ensures the board spec matches the storage system requirements.
Worth knowing
Conservation area properties in central Banbury may need additional checks before any external work is carried out on the building fabric. Battery storage is typically an internal installation, but if your inverter or meter tails need rerouting externally, it is worth confirming with the local planning authority before booking.
If your solar panels were installed under the old Feed-in Tariff scheme, adding battery storage can affect the way your generation and export are metered. We will review your FiT agreement details during the survey so your export payments are protected and the installation is compliant with your original registration.
Banbury properties on the Hardwick or Hanwell Fields estates often have compact utility spaces. Tell us the available wall dimensions and whether you have a garage or dedicated plant room when you enquire, so we can confirm which battery enclosures will physically fit before the survey visit.
FAQs
Most properties in Banbury are suitable, whether you are in a modern new-build on Hanwell Fields or an older stone property closer to the town centre. The key factors are whether you have or are planning solar panels, the location and condition of your consumer unit, and available space for the battery enclosure. Some older properties may need minor electrical work before the battery can be safely connected. We assess all of this during the free survey, so you will have a clear answer before any commitment is made. Call 01527 337155 to book.
We install Tesla Powerwall 3, GivEnergy, Fox ESS, and EcoFlow systems. Each brand has different strengths: the Powerwall 3 integrates tightly with Tesla solar hardware and has a large usable capacity; GivEnergy and Fox ESS are popular for their flexible tariff-charging features and compatibility with agile electricity tariffs; EcoFlow suits applications where portability or modular expansion matters. We recommend the right brand for your specific consumption profile and budget after the survey, rather than defaulting to one product for every customer.
It can do if the installation is not set up correctly. If your panels were registered under the old Feed-in Tariff scheme, your export payments are based on a deemed or metered figure, and adding storage changes the way generation flows. We review your FiT registration details during the survey and configure the battery system so that your export tariff position is preserved and the installation is compliant with the terms of your original registration. We also handle DNO notification, which is a separate requirement that FiT-era customers sometimes overlook when adding storage.
Yes, but the capability depends on the battery and inverter you choose. Whole-home backup requires a system configured for islanding, where the battery and inverter disconnect from the grid and supply your home independently during an outage. Tesla Powerwall 3 and certain GivEnergy configurations support this natively. Other systems offer partial backup, powering selected circuits rather than the whole property. We discuss your backup requirements during the survey and specify accordingly. If backup power is a priority for you, tell us when you enquire and we will make sure we focus on that during the visit.
Most single-battery installations take between four and seven hours on the day, depending on the complexity of the cabling route, whether consumer unit work is required, and how many battery modules are being installed. We aim to arrive at a confirmed start time and leave you with a fully commissioned, working system on the same day. Larger multi-battery or three-phase installations may require a second visit, but we will confirm the schedule clearly in the quote. You will not be left with a partially installed system overnight.
Yes. Commercial battery storage is a growing area, particularly for businesses with significant daytime energy loads or those looking to reduce their demand charges by discharging stored energy during peak periods. We work with small and medium businesses across Banbury and the surrounding OX16 and OX17 area. Commercial installations are quoted separately from domestic jobs and involve a more detailed load assessment. If you are considering battery storage for a business premises, call 01527 337155 and we will arrange a commercial survey at a time that causes minimal disruption to your operation.
Our commitment
We take on a limited number of installations each week so that every job gets the time it needs. Battery storage is not a task you can rush; commissioning, DNO paperwork, and app configuration all need to be done properly or the system will not perform as specified. Keeping our schedule tight means we are never cutting corners to fit in an extra job at the end of the week.
Who we are
We are Djuka Electrics, based in Beoley, Redditch, Worcestershire. We are MCS-certified solar installers and NAPIT-registered electricians, and we have been fitting battery storage systems across the Midlands and into Oxfordshire for residential and commercial customers. Our reviews and installation photos are genuine and available to view before you commit to anything.
Nearby
More in Banbury
Send your postcode and a few details. Within 24 hours you’ll have an honest, written quote from a qualified Midlands electrician, no pushy sales calls, no hidden charges.