All Commercial Solar Staffordshire

Commercial Solar Panels in Tamworth

Free site survey, MCS-certified installation, and G99 DNO applications handled in-house for Tamworth businesses, schools, and care homes.

50 min
from our workshop
78,000
residents
NE of Redditch
from Redditch
Djuka Electrics commercial solar installation

Tamworth's mix of post-war industrial estates, retail parks, and consistent pitched-roof commercial buildings makes it one of the more solar-friendly towns in Staffordshire. Whether you run a warehouse off the A5 corridor, manage a care home in the B77 or B79 postcodes, or oversee a school estate, the roof space is usually there and the return on a well-specified system is real. We carry out a full site survey before we quote you a penny, and we tailor every system to what your roof, your grid connection, and your energy profile can actually support.

We are MCS-certified and handle the full process in-house, including the G99 DNO application required for installations over 30 kWp. You do not need to manage a separate engineer for grid connection paperwork or chase your Distribution Network Operator yourself. We do that. From first call to commissioned system, one team, one point of contact, and no hidden costs.

What's included

Every Tamworth job includes.

A full commercial site survey covering roof condition, orientation, shading analysis, and structural load, so the design is grounded in what your building can realistically support before any specification is agreed.

Energy consumption analysis using your actual bills and meter data, so we size the system to offset the loads that cost you the most rather than simply filling available roof space.

A fully itemised, written quotation with a projected site-specific return on investment, presented clearly so your finance team, board, or trustees can make a properly informed decision.

G99 DNO application prepared and submitted in-house for systems above 30 kWp, removing the single biggest administrative obstacle most commercial customers face during the planning phase.

Supply and installation of commercial-grade PV panels, inverters, and mounting systems by our own NAPIT-registered engineers, not subcontracted labour, with all work signed off to current Part P standards.

Post-installation documentation pack including MCS certificate, grid connection confirmation, system commissioning report, and the paperwork your insurer and ESG reporting team will need.

Local knowledge

Commercial Solar in Tamworth.

Tamworth sits at the north-eastern edge of the West Midlands conurbation, straddling the Staffordshire and Warwickshire border with the M42 and A5 providing straightforward access from our Redditch base. The town's commercial fabric reflects its post-war overspill history: large single-storey industrial and retail units along Lichfield Road and the Bonehill Road corridor, estates of brick-built mid-century factories with broad flat or low-pitched roofs, and a significant number of care homes and educational buildings serving the expanded residential population in the B77 and B79 postcode areas. These roof profiles are almost uniformly well-suited to commercial PV: wide, consistent spans with minimal plant obstruction and south or south-west aspects that generate strong yield figures through the year.

The newer business parks around the A5 and the Ventura retail area include modern steel-frame and cladded buildings where ballasted flat-roof arrays are straightforward to install without roof penetrations, keeping landlord negotiations simple. Schools and academies in the town typically hold their own buildings and have both the roof space and the daytime electricity demand profile that makes solar economics particularly compelling: high consumption during daylight hours lines up almost directly with generation peak. Care homes carry a similarly favourable demand profile, with round-the-clock base loads that battery storage can complement well.

Tamworth Borough Council has supported net-zero commitments in line with wider Staffordshire targets, which means planning consent for commercial solar is generally straightforward for non-listed buildings. That said, the town centre conservation area around the castle and the older market streets carries its own permitted development constraints, and any building within a designated area or with listed status will need a planning officer conversation before installation proceeds. We flag this at survey stage so there are no surprises.

Why Tamworth

Why Tamworth chooses us.

Tamworth businesses choose us because we manage the whole project, not just the panel installation, and we are on site within practical driving distance when anything needs attention.

1

We are MCS-certified for commercial solar PV, which is a contractual requirement for accessing most business energy schemes and for the installation to carry recognised quality assurance. Our certification covers the full scope of commercial work, not a domestic add-on.

2

We handle G99 DNO applications in-house for systems above 30 kWp, a process that can take weeks and stall projects when it is left to the customer. Our engineers have prepared and submitted multiple G99 applications and know what the network operators require first time.

3

Every installation is carried out by our own NAPIT-registered engineers. No subcontracted labour arrives on your site without our direct oversight, which matters for safeguarding obligations at schools and care homes and for commercial insurance requirements generally.

4

We produce a site-specific ROI projection based on your actual consumption data, not industry averages. That projection is part of your written quote so your decision-makers have a document they can put in front of a board or finance committee without additional work.

5

We are based in Redditch, around 50 minutes from Tamworth via the M42, and we cover the full B77-B79 postcode area. Post-installation support, warranty callouts, and annual performance checks are all carried out by the team who installed your system.

How it works

From enquiry to job done.

  1. 01
    Postcode check

    Tell us your Tamworth postcode and building type and we confirm coverage immediately. We cover the full B77-B79 area and the surrounding Staffordshire postcodes without a call-out fee for the initial survey stage.

  2. 02
    Free site survey

    One of our MCS-certified engineers visits your site, assesses roof condition, orientation, shading, and structural load, reviews your electricity meter data, and takes the information needed to design a properly specified system. There is no charge for this visit.

  3. 03
    Written quote issued

    We send a fully itemised written quotation, including a site-specific ROI projection, system specification, and notes on any DNO or planning considerations relevant to your building. No ambiguity, no add-ons discovered later.

  4. 04
    Date booked

    Once you approve the quote, we confirm your installation date and begin the G99 DNO application if required. We keep you updated at each stage so your operations team can plan around access requirements and any temporary supply interruptions.

  5. 05
    Job done, photos sent

    Our engineers commission the system, test all outputs, and hand over your full documentation pack: MCS certificate, commissioning report, grid connection confirmation, and before-and-after installation photos for your records and ESG reporting.

Our work

Recent Commercial Solar installs.

A selection of our recent commercial solar work across the Midlands.

Commercial flat-roof solar array on a factory unit
Aerial view of a large rooftop solar installation
Wide rooftop commercial solar panel array
Djuka scaffold truck on a commercial install site

Worth knowing

Before you book in Tamworth.

Flat and low-pitch roofs common on Tamworth's industrial and retail stock vary in membrane condition. A structural and weatherproofing assessment before installation is essential: a solar array fitted to a roof needing re-covering in three years creates costly disruption. We include a roof-condition check in our survey at no charge.

Commercial installations above 50 kWp require planning permission in addition to the G99 DNO notification. If your building sits within or adjacent to Tamworth's town-centre conservation area, the bar is higher. We advise on permitted development limits early and can support a pre-application conversation with the planning authority.

Grid export capacity on some older Tamworth industrial estates can be constrained, limiting the size of system your DNO will permit to export. A DNO pre-application check, which we carry out before finalising your design, establishes whether export limiting or battery storage is needed to make the system viable at your preferred scale.

FAQs

Tamworth questions.

How long does a commercial solar installation take in Tamworth?

The survey visit typically takes one to two hours depending on building complexity. After that, we issue your written quote within a few working days. Once approved, the G99 DNO application for systems above 30 kWp can take several weeks, as that timeline is set by the network operator rather than us. Physical installation on most commercial roofs takes two to five days depending on system size and roof access. We give you a realistic programme at quote stage so your operations team can plan accordingly, and we flag the DNO timescale early so it does not catch anyone by surprise.

Do I need planning permission for commercial solar panels in Tamworth?

Most commercial buildings in Tamworth can install solar under permitted development rights, provided the system does not protrude more than 200mm from the roof surface and the building is not listed or within a conservation area. Systems above 50 kWp require a full planning application regardless of location. Tamworth's town-centre conservation area, around the castle and older market streets, carries stricter controls. We assess your permitted development position at survey stage and will advise you before any design work is finalised, so you know whether a planning application is needed before committing to the project.

What is a G99 application and do you handle it?

A G99 application is the formal notification to your Distribution Network Operator that you intend to connect a generating system of more than 30 kWp to the grid. The network operator reviews the application to confirm the local grid can accommodate your export capacity, and they may impose export limits or request modifications to the inverter settings. This process can take four to twelve weeks and is the single most common cause of commercial solar project delays. We prepare and submit G99 applications in-house as part of our standard commercial service, keeping you updated at each stage without you needing to manage the correspondence directly.

Can solar panels work on a flat roof on a Tamworth industrial unit?

Yes, and flat roofs are often simpler to work with than pitched roofs on commercial buildings. We use ballasted aluminium racking systems that hold panels at an optimal tilt angle without penetrating the roof membrane, which keeps the roof warranty intact and simplifies landlord permissions on leasehold units. We assess membrane condition and structural load capacity at survey stage, because fitting an array to a roof that needs re-covering in the near future creates unnecessary disruption. Flat-roof ballasted systems on Tamworth's industrial stock consistently deliver strong output figures given the open sky exposure typical of single-storey buildings.

How much will commercial solar cost for my Tamworth business?

We do not publish price lists because the right system for your building depends on roof size, orientation, structural condition, your electricity consumption profile, your DNO's export capacity, and whether battery storage or EV charging is being added at the same time. Every quotation is free, written, fully itemised, and based on a site survey. It will include a site-specific return on investment projection using your actual meter data so you have a clear financial picture before making any commitment. There are no hidden costs added after the quote is agreed. Call us on 01527 337155 or request a survey online to get started.

Is commercial solar suitable for schools and care homes in Tamworth?

Schools and care homes are among the most commercially attractive use cases for solar PV. Both have high daytime electricity consumption that aligns closely with solar generation peak, meaning a well-specified system achieves high self-consumption without needing to rely on export income. Care homes also carry significant overnight base loads that make paired battery storage well worth considering. Our engineers are experienced working on occupied care and educational sites, which means safeguarding-aware site management, advance notice for access, and minimal disruption to daily operations. MCS certification and our NAPIT registration satisfy most procurement and insurer requirements for these building types.

Our commitment

We take on a managed number of commercial projects at any one time. That is a deliberate choice: a commercial solar installation carried out properly requires consistent engineering oversight from survey through to commissioning, and splitting attention across too many sites at once is how errors get made. When we confirm your installation date, that date is held and the same engineers who surveyed your site carry out the work.

Who we are

We are Djuka Electrics, based in Beoley, Redditch, Worcestershire, and we cover Tamworth and the wider Staffordshire area as part of our core operating territory. We are MCS-certified for solar and NAPIT-registered for electrical work. Every installation is backed by an IWA insurance-backed guarantee. Our customers include businesses, schools, and care homes across the Midlands, and we are happy to share real photos and verified reviews from completed commercial projects on request.

No Hidden Costs · Free Quote

Ready for your free commercial solar quote in Tamworth?

Send your postcode and a few details. Within 24 hours you’ll have an honest, written quote from a qualified Midlands electrician, no pushy sales calls, no hidden charges.

01527 337155Free quote