All Commercial Solar West Midlands

Commercial Solar Panels in Coventry

Free site survey, G99 DNO application handled in-house, and a fully itemised written quote for your Coventry business, school, or care home.

45 min
from our workshop
345,000
residents
E of Redditch
from Redditch
Djuka Electrics commercial solar installation

Coventry businesses are sitting on some of the most viable commercial solar real estate in the West Midlands. The city's legacy warehouse stock around Foleshill and Tile Hill, its school campuses, and its growing portfolio of care homes all share one thing: large, often underused roof planes that can generate meaningful electricity and cut operating costs for decades. We design, supply, and install commercial solar PV systems for SMEs, multi-site operators, schools, and care homes across the CV postcode area, handling every stage from initial survey through to grid connection.

What separates us from the typical solar outfit is operational depth. We are MCS-certified and NAPIT-registered, so the electrical and generation sides of every project are covered under one contractor. We manage G99 DNO applications in-house for installations over 30 kWp, which removes a significant administrative burden from your facilities team. Every quote is free, written, and itemised. There are no hidden costs and no surprises on completion day.

What's included

Every Coventry job includes.

A full roof and electrical infrastructure survey at your Coventry site, carried out before any quote is produced. We assess structural loading, roof orientation, shading from neighbouring buildings, and your current consumption profile to size the system correctly.

A written, itemised quotation detailing panels, inverters, mounting hardware, electrical work, and any enabling works required. Every line is transparent. Nothing is bundled to obscure the real cost.

MCS-certified design and installation to current IET Wiring Regulations and G98/G99 standards, with all documentation produced for your records and any future building sale or lease.

G99 DNO application submitted and managed in-house for systems over 30 kWp, coordinating directly with the distribution network operator so your team does not have to chase paperwork or interpret technical responses.

Commissioning, system testing, and a handover session so your facilities manager or finance lead understands output monitoring, inverter alarms, and how to read generation data for ESG and net-zero reporting.

Before and after photographic documentation of the installation, together with a full system file including wiring diagrams, equipment warranties, MCS certificate, and DNO approval confirmation.

Local knowledge

Commercial Solar in Coventry.

Coventry's commercial building stock is unusually well suited to solar PV. The city expanded rapidly through the mid-twentieth century to support its automotive and manufacturing industries, and that legacy has left a large inventory of flat and low-pitch industrial rooftops, particularly around Foleshill in the north and Tile Hill and Canley to the west. These roofs are typically wide, unobstructed, and oriented in ways that produce strong annual yields. Many have not been upgraded since original construction, which means a re-roofing project and a solar installation can often be combined to reduce overall mobilisation costs. We always confirm structural suitability before committing any design to paper.

Beyond the industrial zones, Coventry has a significant number of schools, further education colleges, and NHS-adjacent care facilities. These organisations face sustained pressure to demonstrate progress against net-zero and ESG commitments, and commercial solar is one of the most straightforward capital investments available to them. A well-sized system reduces grid import materially during occupied hours, generates credible carbon-reduction data for annual reporting, and qualifies for any applicable government incentive schemes current at the time of installation. We work with facilities managers and finance directors alike to produce the evidence trail that governance and procurement teams need.

The CV1 to CV6 postcode corridor also includes a growing number of newer commercial developments, business parks, and retail units, many of which were built with flat membrane roofs that accept ballasted solar mounting without roof penetrations. Planning consent for commercial solar in Coventry is generally covered by permitted development for most industrial and commercial buildings, though listed structures and conservation-area properties near the city centre require a pre-application conversation with Coventry City Council. Where planning consent is needed, we flag this clearly in the survey stage and can advise on the documentation required.

Why Coventry

Why Coventry chooses us.

Coventry businesses choose us because we cover the electrical work, the MCS certification, and the DNO application under one contract with no hidden costs.

1

We are MCS-certified for solar and NAPIT-registered for electrical work, meaning your installation meets the certification standards required for grid connection, warranty validity, and any applicable government incentive schemes, all under one contractor rather than two.

2

We handle G99 DNO applications in-house for systems over 30 kWp. Most commercial installers pass this task back to the client. We do not. We submit, correspond, and obtain approval directly with the network operator, keeping your programme on track.

3

Every quote is free, written, and itemised after a physical site survey. We do not produce desktop estimates from satellite imagery. You receive a document you can take to your board, your finance director, or your procurement team with confidence that the figure is accurate.

4

We carry full public liability and employer's liability insurance and can provide evidence of cover before we step onto your site, satisfying the requirements of most commercial health and safety procurement processes.

5

We are based in Redditch, roughly 45 minutes from central Coventry via the A45 and A46. That proximity means we can survey quickly, return for snagging without significant mobilisation cost, and provide ongoing support without treating Coventry as a distant outpost.

How it works

From enquiry to job done.

  1. 01
    Postcode check

    Enter your CV postcode on our website or call us on 01527 337155. We confirm coverage immediately. Coventry falls within our standard operating area, so there is no delay at this stage and no additional travel charge factored into your quote.

  2. 02
    Free site survey

    We visit your Coventry site at a time that suits your operations. We inspect the roof, assess orientation and shading, review your metering and switchgear, and discuss your consumption data and ESG objectives. The survey is completely free and carries no obligation.

  3. 03
    Written quote issued

    Within a few working days of the survey we send a fully itemised written quotation covering panels, inverters, mounting, electrical works, G99 application handling where applicable, and commissioning. Every cost is visible. There are no bundled lines or provisional sums.

  4. 04
    Date booked

    Once you approve the quote we agree an installation date that minimises disruption to your site. For larger systems we provide a programme showing each phase of work so your facilities team can plan around us.

  5. 05
    Job done, photos sent

    We complete the installation, commission the system, and carry out all testing to IET and MCS standards. You receive before and after photographs, a full system file with wiring diagrams and warranties, your MCS certificate, and DNO approval documentation.

Our work

Recent Commercial Solar installs.

A selection of our recent commercial solar work across the Midlands.

Commercial flat-roof solar array on a factory unit
Aerial view of a large rooftop solar installation
Wide rooftop commercial solar panel array
Djuka scaffold truck on a commercial install site

Worth knowing

Before you book in Coventry.

Flat and membrane roofs common across Coventry's industrial estates need a structural survey before any mounting system is specified. Ballasted racking avoids roof penetrations but adds loading. We confirm whether the roof structure can carry that load as part of our free site survey, before any commitment is made.

G99 applications for systems over 30 kWp require the distribution network operator's approval before export can begin. This process takes time and the outcome can affect system sizing. We submit and manage the application in-house, but you should factor potential DNO lead times into your project programme from the outset.

Commercial solar installations on or adjacent to listed buildings, or within Coventry's designated conservation areas near the medieval city centre, may require full planning permission rather than relying on permitted development rights. Identifying this early avoids programme delays. We check planning status at survey stage as standard.

FAQs

Coventry questions.

How much does commercial solar cost for a business in Coventry?

Every commercial solar system is quoted individually after a free site survey. Cost depends on roof size, orientation, structural condition, system capacity, inverter configuration, and whether battery storage or EV charging is being added at the same time. We do not publish price ranges because a figure produced without a survey is unreliable and can lead to a nasty surprise on completion. Our quote is free, written, fully itemised, and produced after we have physically inspected your site. There are no hidden costs and no provisional sums. Call us on 01527 337155 to book your free survey.

What is a G99 application and do I need one for my Coventry site?

G99 is the technical and administrative process required by distribution network operators before a generator over 16 A per phase, typically systems over around 11 kWp on a three-phase supply, can export electricity to the grid. For most commercial systems over 30 kWp, a full G99 application is required and the DNO must approve it before commissioning. The process involves submitting load flow and protection data and can take several weeks. We manage the entire G99 application in-house, liaising directly with the relevant DNO so your team does not need to interpret technical correspondence or chase progress.

Can solar panels be installed on a flat roof at my Coventry warehouse or industrial unit?

Yes. Flat and low-pitch roofs across Coventry's industrial estates in Foleshill, Tile Hill, Canley, and similar areas are well suited to commercial solar. We typically use ballasted mounting systems that avoid roof penetrations, which preserves the membrane warranty on modern flat roofs. Before specifying any mounting system we carry out a structural assessment to confirm the roof can carry the additional loading. If structural strengthening is required we flag this clearly in the survey report. We also check the condition of the membrane and recommend any necessary remedial work before panels are installed.

Will commercial solar help with our company's net-zero or ESG reporting?

It will, provided the system is properly certified and documented. An MCS-certified installation produces a verifiable generation record that can be fed directly into carbon accounting for Scope 2 emissions. The system monitoring data provides auditable evidence of kilowatt-hours generated on site, reducing your reliance on grid electricity and the associated carbon factor. For schools, care homes, and larger businesses in Coventry that are required to report under ESOS, SECR, or their own ESG frameworks, a well-documented commercial solar installation is one of the most straightforward improvements available. We provide the full documentation package at handover to support your reporting obligations.

Do I need planning permission for commercial solar panels in Coventry?

Most commercial and industrial buildings in Coventry can install rooftop solar under permitted development rights without a formal planning application. However, permitted development does not apply to listed buildings, and properties within designated conservation areas, including some locations near Coventry city centre, may require consent. Installations visible from a highway or exceeding certain size thresholds can also trigger a planning requirement. We check planning status as part of our free site survey and advise you clearly before any design work begins. If a planning application is needed we flag the likely process and timescales so you can factor them into your programme.

How long does a commercial solar installation take from survey to switch-on in Coventry?

Timeline depends on system size and whether a G99 DNO application is required. A smaller commercial system under the G98 threshold can typically move from approved quote to commissioned system in a few weeks, subject to equipment lead times. Larger systems requiring a G99 application need the DNO approval before commissioning can proceed, which adds lead time outside our direct control. We provide a clear programme at quote stage showing each phase including the DNO application window, so you know what to expect. We communicate any changes to the programme as soon as they arise rather than leaving you to chase.

Our commitment

We take on a limited number of commercial projects at any one time. That is not a sales tactic. It is how we maintain the quality of survey, design, and installation that commercial clients rightly expect. Cutting corners on a 50 kWp rooftop system is not recoverable without significant cost. We would rather tell you our next available slot honestly than overcommit and deliver a system that underperforms.

Who we are

Djuka Electrics is based in Beoley, Redditch, and covers commercial and domestic projects across a 50-mile radius including the whole of the Coventry CV postcode area. We are MCS-certified and NAPIT-registered. Every project is photographed and documented, and our reviews reflect real jobs on real sites. Call us on 01527 337155 to arrange a free site survey.

No Hidden Costs · Free Quote

Ready for your free commercial solar quote in Coventry?

Send your postcode and a few details. Within 24 hours you’ll have an honest, written quote from a qualified Midlands electrician, no pushy sales calls, no hidden charges.

01527 337155Free quote