Free site survey, MCS-certified installation, and G99 DNO applications handled in-house for businesses across Droitwich Spa and WR9.

Droitwich Spa's flat topography and open rooflines make it one of the more straightforward locations in Worcestershire for commercial solar PV. Whether you run a manufacturing unit on one of the town's trading estates, manage a care home, or own a school or multi-site SME, a well-designed solar array can cut your imported electricity significantly and support the ESG reporting your stakeholders increasingly expect.
We are MCS-certified installers based in Redditch, roughly 25 minutes north-east of Droitwich via the A38. We handle every stage in-house: site survey, system design, G99 DNO application for installs over 30 kWp, and commissioning. You deal with one team from first contact to the day the system goes live, with no subcontracted surprises and no hidden costs.
What's included
A full, no-obligation site survey covering roof or ground structure, orientation, shading analysis, existing metering, and grid connection capacity, completed before any design work begins.
A written, itemised quote with a site-specific ROI projection so you can take it to your board, finance team, or accountant with confidence.
System design and equipment specification matched to your actual consumption data, not a generic template, including inverter sizing and cabling routes.
G99 DNO application prepared and submitted on your behalf for installs over 30 kWp, including all correspondence with the network operator until approval is granted.
Full MCS-certified installation by our own qualified engineers, with scaffolding, penetration sealing, and structural fixings appropriate to your roof type, whether flat membrane, steel profile, or pitched tile.
Commissioning, handover documentation, generation meter registration, and a set of before-and-after photographs so you have a clear record for your ESG or sustainability report.
Local knowledge
Droitwich Spa sits in the Worcestershire plain at low elevation with very little natural shading from surrounding hills or dense woodland. For commercial solar this matters: a south or south-west facing roof here will receive close to the best irradiance available in the West Midlands, and even east-west split arrays on flat industrial roofs perform well given the unobstructed sky. The town's flat profile also simplifies scaffold planning, which can keep project timelines tighter than hillier locations nearby.
The commercial building stock in and around Droitwich is varied. The town centre retains Victorian and Edwardian commercial premises, some of which carry conservation sensitivities that require careful panel placement or even pre-application discussion with Wychavon District Council. Further out, the trading estates and business parks that ring the A38 and M5 junction corridor contain large, modern industrial and warehouse units with metal or membrane flat roofs that are ideally suited to ballasted or mechanically fixed solar arrays. Care homes and schools in the residential neighbourhoods tend to sit on pitched roofs, which require a different fixing approach but are equally well-suited to MCS-certified installs.
Grid connection is handled through National Grid's regional distribution network. Larger commercial installs above 30 kWp require a G99 application and formal approval before commissioning. This process can add several weeks to the project timeline if it is not started early. We initiate the DNO application as soon as your design is signed off, which means approval and installation can often be sequenced efficiently. For businesses in Droitwich planning to combine solar with EV charging infrastructure or battery storage, early grid capacity checks are particularly important and are built into our survey process.
Why Droitwich Spa
Droitwich businesses choose us because we are a local MCS-certified team who handle the technical and regulatory complexity so you do not have to.
MCS certification covers both the installation and the equipment we specify, meaning your system qualifies for the Smart Export Guarantee and any future government support schemes that require accredited installs.
We manage G99 DNO applications entirely in-house. You never need to contact the network operator yourself; we track the application and update you at each stage until approval is granted.
Every quote is free, written, and itemised with a site-specific ROI projection. There are no day-rate surprises or vague estimates. You know exactly what is included before you commit.
We are fully insured and NAPIT-registered, and all electrical work is certified to current standards. Our documentation package satisfies EPC assessors, insurers, and finance providers.
Being based in Redditch means our engineers are on site in Droitwich within 30 minutes for surveys, snagging visits, or any post-commissioning query. You are not waiting for a national contractor to route someone from the other end of the country.
How it works
Enter your WR9 postcode or call us on 01527 337155. We confirm immediately that Droitwich Spa is within our coverage area and that your site type (industrial, school, care home, retail) is within our commercial install experience.
One of our engineers visits your premises at a time that suits you. We assess roof structure, orientation, shading, existing metering, and grid connection capacity. The survey is free, with no obligation to proceed, and typically takes 60 to 90 minutes for a commercial site.
We prepare a full written, itemised quote including system design, equipment specification, G99 implications if applicable, and a site-specific ROI projection. You receive this within a few working days of the survey. No hidden costs, no vague line items.
Once you accept the quote, we agree an installation date that fits your operational schedule. We also initiate the G99 DNO application at this point so the approval timeline runs in parallel with any preparatory work, minimising delays to commissioning.
Our engineers complete the installation, commission the system, register the generation meter, and hand over a full documentation pack including MCS certificate, electrical certification, and before-and-after photographs suitable for your ESG or sustainability reporting.
Our work
A selection of our recent commercial solar work across the Midlands.




Often booked together
Pairing solar with battery storage lets your business store generation during low-demand periods and draw it down during peak tariff hours. For Droitwich SMEs with variable intraday consumption, this significantly improves the self-consumption rate and strengthens the ROI case.
Many Droitwich commercial sites are planning EV charging for staff or fleet vehicles. Installing charging infrastructure at the same time as solar reduces cabling costs and lets you offset charging energy directly from your own generation rather than the grid.
Solar installs often coincide with a wider site upgrade. Adding CCTV at the same time shares the same scaffolding access and electrical first-fix visit, reducing overall project disruption for your staff and tenants.
Worth knowing
Flat-roof commercial buildings on Droitwich's trading estates often have membrane surfaces that require ballasted frames rather than penetrating fixings. Your landlord or building insurer may need to approve the installation method, so check your lease and policy before instructing any installer.
Properties within or adjacent to Droitwich's conservation areas, which cover parts of the Victorian town centre, may require a pre-application heritage assessment from Wychavon District Council before solar panels can be installed. We can advise on likely requirements at the survey stage, but the planning decision rests with the council.
Commercial installs above 50 kWp may trigger additional grid reinforcement requirements from the DNO, which can extend the approval timeline and, in rare cases, require a contribution to upstream network upgrades. We flag this risk clearly in the written quote so there are no surprises later in the project.
FAQs
Timeline depends on system size, roof type, and how quickly the DNO approves the G99 application for installs over 30 kWp. A straightforward install on a flat industrial roof in Droitwich, once DNO approval is in hand, typically takes one to three days on site for the physical installation. The G99 approval process runs in parallel with project preparation and can take several weeks, so starting it early is important. We explain expected timescales clearly in your written quote so you can plan around it.
Most commercial solar installations in Droitwich benefit from permitted development rights, meaning formal planning permission is not required. The main exceptions are listed buildings, scheduled monuments, and properties within a conservation area where the panels would be visible from a public highway. Parts of Droitwich's Victorian town centre carry conservation designation, so if your premises sit in or adjacent to that area, a pre-application discussion with Wychavon District Council is sensible. We identify likely planning constraints at the survey stage and flag them clearly in your quote.
G99 is the technical and legal process by which your system is formally approved to connect to the local electricity distribution network. It is required for commercial solar installs above 30 kWp. The application involves submitting detailed system design information to the DNO, who assess the impact on the local grid and issue approval conditions. The process can take several weeks. We handle the entire G99 application in-house on your behalf, from preparation and submission through to approval, so you do not need to engage with the DNO directly at any point.
Yes. Flat membrane roofs are common on the trading estates and business parks around the A38 corridor in Droitwich and are well-suited to commercial solar. We use ballasted aluminium frame systems that sit on protective pads without penetrating the membrane, preserving your roof warranty. Before the survey we ask you to confirm your roof membrane type and age, and we check with your building insurer or landlord if the lease requires it. Droitwich's flat topography means these roofs typically have excellent solar access with minimal shading.
Generating your own electricity does not in itself change your business rates assessment in most cases, but it is worth discussing with your rates surveyor if the array is unusually large. For corporation tax, capital allowances may be available on the plant and machinery elements of a commercial solar install, and some businesses can claim under the Annual Investment Allowance. We are not tax advisers, so we recommend raising this with your accountant. We provide the full asset breakdown and MCS documentation they will need to assess your position accurately.
Yes. Schools and care homes are among the most suitable commercial solar sites because they typically have large roof areas, relatively predictable daytime electricity consumption, and ESG or sustainability reporting requirements that a documented MCS-certified install supports directly. We have experience designing systems for both building types. Care homes in particular benefit from battery storage paired with solar to manage overnight demand. If you are based in or around Droitwich and want to understand what a system might look like for your site, a free survey is the right starting point. Call us on 01527 337155 to arrange it.
Our commitment
We keep our commercial project pipeline manageable so each site gets proper attention from survey through to commissioning. That means we do not take on more installs than our own engineers can deliver to the standard our MCS certification requires. If our current schedule means a short wait, we will tell you upfront rather than rush the job to fit an overfull diary.
Who we are
We are Djuka Electrics, based in Beoley, Redditch, and we cover Droitwich Spa and the wider WR9 area as part of our regular Worcestershire and West Midlands territory. We are MCS-certified for solar and NAPIT-registered for electrical work. Every install comes with real photographs and genuine customer reviews you can read before you book.
Nearby
More in Droitwich Spa
Send your postcode and a few details. Within 24 hours you’ll have an honest, written quote from a qualified Midlands electrician, no pushy sales calls, no hidden charges.